Profile pentru reparatii de durata in industria podelelor HCJ HC-Delta Sinus Slide
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
HC Sinus Slide® joints for lasting repairs in industrial floors
Damaged joints in floors are a real nightmare for every warehouse and facility manager. It is a
source of continuous frustration and annoyance for owners and users of logistic buildings and
warehouses.
When damage becomes evident associated with a joint there will be an irreversible spiral of
damage that becomes worse, worse and worse until the situation is intolerable.
Damage is not only evident on the joint and floor but also material handling equipment,
transported goods and even the forklift operators will be affected due to the constantly
recurring shocks and striking impacts of the wheels.
This vicious circle of damage can only be stopped by lasting repairs which neutralise the
cause of damage. The cause of damage is the striking impact of the passing wheel of the
forklift which will fall in the opening gap of the joint.
The solution is to creat
e a situation where wheels are continuously supported and slide,
vibration and shock free, from one floor slab to another. This is a feature of the Sinus Slide®
joint, which makes them extremely useful for joint repair.
The power of the HC-Sinus Slide® joint is that it neutralises the impact of the shocks of the
striking wheels, which is the cause of damage. With the HC Sinus Slide joint 100 % shockand vibration free transfers are realised, so future damage is impossible.
HCJ have developed 2 kinds of repair solutions which, depending on the extent of the damage
are extremely useful.
Pagina 1 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
1. HC-Sinus Slide® repairs with jointing system
In this case the complete joint needs to be replaced or there is no joint at all between the floor
slabs. The complete joints needs to be replaced if the joint is from dub
ious quality or there is
extensive vertical displacement that a fundamental repair is the only solution. The original
joint normally had the following functions.
•
Free horizontal expansion and contraction of the industrial floor. As the poured
concrete dries, the inevitable contraction is taken up by the horizontal spreading of
the expansion joint. Once the dilatation process is stabilised the joint only will
expand slightly by extreme fluctuating temperature. The existing joint opening is a
result of the shrinkage movement of the concrete slabs. The shrinkage of a floor
slab is strongly dependent on a number of thermal variables as well as the quality
of the concrete. Shrinkage can vary between 0,3 to 0,5 mm/meter. In any case, an
attempt must be made to limit the opening of the joints to a maximum of 20 mm.
An indication in normal conditions would be floor sections of 30 to 40 metres.
However, the advice of a local expert is always recommended because shrinkage
can vary consider
ably from country to country due to local environmental factors
and concrete quality. Even if shrinkage and cracks are under control there is
another problem which can be a source of annoyance, lead to uncomfortable and
unsafe work stations and significant costs. That problem is the straight traditional
joint opening gap.
•
Load transfer and the limit of any vertical movement. The construction of the
joint ensures the floor slabs are connected and that any vertical movement is
limited. This principle enables also to realize the necessary load transfer which
gives much better support of the slab and extends its life.
Pagina 2 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
•
•
The traditional straight expansion joint provides edge protection which is
however not sufficient for certain applications and/or intense traffic
An expansion joint is also sui
table for use as day joint profile and a help when
finishing the floor.
Once the shrinkage process is stabilised the only functions of the expansion joints are
horizontal movement of the floor slabs in case of extreme fluctuating temperatures, the
limitation of any vertical movement, load transfer and edge protection. In case of intense
forklift traffic the opening gap of the joints is a source of continuous frustration and will
cause huge costs and problems. The HC Sinus Slide® Joint has a sliding capacity which
enables smooth load transfers and vibration- and shock free wheel crossings on the joint.
You can still see a opening gap but you don’t feel or hear it anymore. Therefore if joint
repair is necessary the HC-Sinus Slide® joint is the only lasting and final solution. If
Sinus Slide® technology had been chosen at the start of the project no repair would have
been necessary as there would be no damage
The repair has to be done as follows:
Saw-cut the concrete full depth on b
oth sides of the damaged joint on a width of
approximately 800 to 1000 mm. Remove carefully the concrete and re-level and recompact the sub-base material.
Pagina 3 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
Then drill and fix deformed bars (ø16 x 600 length) in each concrete slab.
At least 3 dowels per meter in each concrete slab. 300 mm of the dowel must be fixed in
the concrete (ideally with resin anchorage system) and 300 mm must stick out. Apply
special primer on all vertical sides of the concrete slab.
Pagina 4 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
Install a HC Sinus Slide® joint in the middle of the gap opening between the concrete
slabs. Level out the HC Sinus Side® joints down and across. Eventually, we
ld the dowels
fixed in the concrete slabs to the anchorage system of the HC Sinus Slide joint or use
reinforcing mesh to link dowels and joint connectors.
Pagina 5 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
Then fill up the opening gap with (reinforced) concrete or special repair concrete. Finish
the floor by polishing. It is recommended to use a HC Sinus Slide® joint with 5 mm
foam between the undulated lips to permit a horizontal movement in the two directions
in case of extreme fluctuating temperatures. This repaired jointing system with sliding
capacity will realise optimal smooth load transfers by 100% shock- and even vibration
free wheel crossings. Future damage is almost impossible and unprecedented comfort is
achieved. Yearly savings on forklifts wheels maintenance or replacement are substantial.
Pagina 6 van 11
Hengelhoefstraat 158
B 3600 G
ENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
Pagina 7 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
Pagina 8 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
2. HC-Sinus Slide® repair joint without jointing system
For repairs on elevated slabs the procedure is similar but there is no need for a complete joint
as the load transfer will be realised by the pre-stressed hollow core slabs or underlying
supporting floor. Also if the connecting jointing system is still in good condition the whole
joint doesn’t need to be removed. What is good can stay in the concrete. You only need to
remove the damaged surface of concrete and joint.
Here t
he specially designed HC-Sinus Slide® repair joint is a sustainable and reliable
solution. This repair joint is standard with 5 mm foam between the undulated plates and with
a round foam on bottom to separate the filling substance.
The repair has to be done as follows:
Saw-cut away the concrete on both sides of the joint to a width of approximately 100 to
150 mm and a depth of about 100 mm according to the accessed damage.
Apply a special primer on all sides of the concrete slab for good adhesion of filling
substance. Drill some holes in the concrete bottom positioned at the same distance as the
anchorage of the HC-Sinus Slide® repair joint. Install screwed rod trough the
anchorage openings and fix into the drilled holes. Level out the HC Sinus Slide® joints
down and across.
Pagina 9 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
Fill up the opening ga
p with (reinforced) concrete or special repair concrete and finish
the floor by polishing as soon as possible.
Pagina 10 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
HENGELHOEF CONCRETE JOINTS
A new era in industrial flooring technology
Pagina 11 van 11
Hengelhoefstraat 158
B 3600 GENK (Belgium)
Tel +32 89 323980
info@hcjoints.be
www.hcjoints.eu
Alte documentatii ale aceleasi game Vezi toate
Fisa tehnica
2 p | EN
Cosinus Slide
Fisa tehnica
1 p | EN
Cosinus Slide