d during construction. Railings for the system are included in the series delivery when
necessary.
3.
Numbering of parking spaces:
Consecutive numbering of parking spaces.
4.
Building services:
Any required lighting, ventilation, fire extinguishing and fire alarm systems as well as clarification
and compliance with the relevant regulatory requirements.
5.
Drainage:
In the middle of the pit a floor drain with connection to the cable network or a pump sump is to be
provided. The water is to be drained with a pump to be provided by the customer. From the pit
corners/bearing surface of the lifting columns an incline to the floor drain/pump sump is
necessary.
For reasons of environmental protection we recommend to paint the pit floor, and to provide oil
and petrol separators in the connections to the public sewage network. To divert large amounts of
water from the court area, we recommend that the customer install a water drainage channel
around the periphery of the pit.
6.
Marking: ... ascunde
Pentru noi, confidențialitatea dvs. este importantă
Portalul spatiulconstruit.ro folosește cookies pentru a asigura funcționalitatea și securitatea site-ului, pentru a personaliza conținutul și modul de interacțiune, pentru a oferi facilități de social media
și pentru a analiza modul în care este utilizat site-ul. Aceste cookies sunt stocate și prelucrate, de către noi sau partenerii noștri în conformitate cu toate reglementările în vigoare și toate standardele
de confidențialitate și securitate actuale.
Vă rugăm să rețineți că este posibil ca anumite prelucrări ale datelor dumneavoastră cu caracter personal să nu necesite consimțământul dumneavoastră, dar vă puteți exprima acordul cu privire la prelucrarea
realizată de către noi și partenerii noștri conform descrierii de mai sus utilizând butonul SUNT DE ACORD de mai jos.
Navigând în continuare, vă exprimați acordul implicit asupra folosirii cookie-urilor.