ing, ventilation, fire extinguishing and fire alarm systems as well as clarification
and compliance with the relevant regulatory requirements.
5.
Drainage:
For the front area of the pit we recommend a drainage channel, which you connect to a floor drain
system or sump (50 x 50 x 20 cm). The drainage channel may be inclined to the side, however
not the pit floor itself (longitudinal incline is available). For reasons of environmental protection we
recommend to paint the pit floor, and to provide oil and petrol separators in the connections to the
public sewage network.
6.
Strip footings:
If due to structural conditions strip footings must be effected, the customer shall provide an
accessible platform reaching to the top of the said strip footings to enable and facilitate the
mounting work.
7.
Marking:
According to DIN EN 14010, a warning that identifies this danger area must be placed in the
entrance area that conforms to ISO 3864. This must be done according to EN 92/58/EWG for
s ... ascunde
Pentru noi, confidențialitatea dvs. este importantă
Portalul spatiulconstruit.ro folosește cookies pentru a asigura funcționalitatea și securitatea site-ului, pentru a personaliza conținutul și modul de interacțiune, pentru a oferi facilități de social media
și pentru a analiza modul în care este utilizat site-ul. Aceste cookies sunt stocate și prelucrate, de către noi sau partenerii noștri în conformitate cu toate reglementările în vigoare și toate standardele
de confidențialitate și securitate actuale.
Vă rugăm să rețineți că este posibil ca anumite prelucrări ale datelor dumneavoastră cu caracter personal să nu necesite consimțământul dumneavoastră, dar vă puteți exprima acordul cu privire la prelucrarea
realizată de către noi și partenerii noștri conform descrierii de mai sus utilizând butonul SUNT DE ACORD de mai jos.
Navigând în continuare, vă exprimați acordul implicit asupra folosirii cookie-urilor.